Case Study C325 Facility Management of Osbit’s Workshop The Osbit Ltd workshop at South Harbour Port of Blyth is the primary assembly location for their diverse array of projects. EMS have been fundamental in the setting up and running of the workshop as specified by...
Case Study BHGE Manufacture 6″ & 8″ Seal, Burst and Creep Tests BHGE approached EMS to assist with their program for developing a new pipe, this required qualification and with that EMS worked from drawings supplied by BHGE to manufacture the Test Rig...
Case Study C105 Offshore Platform Supply and Installation. EMS started by providing support in the fabrication stages, checking that components would arrive at the correct time, carrying out visual inspection and witnessing dimensional checks. Whilst the platforms...
Case Study C200 DeepOcean ACP2 Plough Share Modifications. The main scope of work was to modify existing shares on one of DOUK’s ploughs that was earmarked for a new project, the modification was to improve the flow of the Jetting outlets. EMS carried out the...
Case Study C215 BHGE Tensile Weldment & Split Flange BHGE required a Tensile Fixture to conduct destructive testing within their Research and Development department, the fabrication was required within a tight lead-time which EMS took on board with several...